广告

水处理钢铁厂废水工业废水处理设备就选济宁天通

水处理钢铁厂废水工业废水处理设备就选济宁天通
收藏 分享
举报
价格 1
起批量 ≥ 100台
供应商 济宁市天通机械设备有限公司
所在地 山东省济宁市任城区唐口街道
朱新社

򈊡򈊨򈊩򈊥򈊣򈊧򈊦򈊨򈊦򈊡򈊠 2512639373 򈊠򈊥򈊣򈊧-򈊥򈊡򈊥򈊩򈊩򈊡򈊩

微信在线

济宁市天通机械设备有限公司
  • 注册城市:山东 济宁
  • 企业类型:政府或其他机构
  • 主营地区:山东省济宁市任城区唐口街道
  • 成立时间:2017-07-10
  • 资质认证: 个人身份已认证 营业执照已认证 天眼查已认证 手机已认证 微信已认证

最近来访记录

北京朝阳用户R***:质量看着不错,服务业很到位。
北京丰台用户f***:商铺不错,价格实惠。
北京朝阳用户X***:购买方便,性价比高。
北京丰台用户y***:种类齐全,很不错。
北京朝阳用户F***:物美价廉,是个不错的选择。
北京朝阳用户V***:对比其他公司产品更加优惠,可以进一步了解。
“水处理钢铁厂废水工业废水处理设备就选济宁天通”详细信息
基本参数
联系人
范经理
手机
18953768880
面向地区
产品名称
污水设备,钢铁厂废水设备,钢厂废水设备
关键词
水处理,钢铁厂废水,工业废水
微信号
15660459503
规格
其它
加工定制
价格
¥1

水处理钢铁厂废水工业废水处理设备就选济宁天通

In ancient times, humans did not have advanced water treatment techniques, and they were treated with simple grille interception and natural sedimentation in order to reduce the water spread of the disease. Then, after years of observation and summarization, they also found that the sand can be used to filter out the fine suspension, and then the coagulation pretreatment was developed. With the continuous progress of human civilization, human waste and the destruction of the environment have caused serious pollution of water resources. When all kinds of infectious diseases pass through water and cause many people to get sick or die, it is important to find out what water treatment is. It is only then that people begin to study water treatment technology.
Since the end of the 19th century, industrial technology has come a long way, and industrial sewage has been doubling every year. Moreover, the rivers and lakes of the industrial powers were severely polluted and gradually became a public nuisance. The discovery of simple chemistry, physical methods and the difficulty of dealing with them has led to new water treatment techniques. Scientists of all countries have begun to study water treatment method, is the earliest sewage aeration experiment, then the biological membrane method, then is the artificial biological treatment method, and then to now targeted ion exchange method, electrochemical processes, such as high and new technology.
Overview of wastewater treatment project in steel plant
The average displacement of the steel plant will reach 4000m to the third/h when the steel plant is produced at 6 million tons/year. The average daily processing capacity of wastewater treatment works is 96,000 m 3, and the maximum daily processing capacity of the summer is 10.8000m 3. 70% of it is returned to the factory pipe network as industrial rehydration, and the remaining discharge after reaching the standard.
The waste water treatment recycling project started construction in April 2010. The main structure was completed in January, 20012. The trial operation was conducted in May 2012 and the production was delivered in August 2012. The project covers an area of 29500 ㎡, the new building and structures which covers an area of 8041 ㎡, green coverage of 32%, the static investment is 86.43 million yuan.
All waste water in the factory will meet the emission standard after treatment, and the water will reach the standard of production water after softening, filtering and disinfecting.
Treatment process
Wastewater design water quality
The original water of this project is a typical metallurgical industrial effluent, which is required to meet the secondary standard of local emission standard after treatment.
Treatment process
This engineering water is typical of steel industry wastewater, organic pollutant content is not high, but biochemical difference is not suitable for biodegradation. This project mainly adopts physical chemistry method. As an industrial rehydration, the process of removing temporary hardness, softening of total alkalinity, filtration and disinfection is added in the treatment of water reuse.
The industrial effluent discharged from the factory is piped into the water inlet of the waste water treatment plant. After the pretreatment part, the large particles in the water will be removed by means of coarse and fine grille. By lift pump to the water distribution structures, again in the dosing coagulant and lime and sulfuric acid, and then assigned to high-density clarifier and wastewater to remove the suspended solids in the water and colloidal substances, ensure the clarity of water, drainage and fluoride in process at the same time. 70% of the total water treated with high-density clarifier, then through v-type filtration process and after adding the liquid chlorine disinfection, sent to the factory as make-up water of industrial water, 30% of the total water discharged after high-density clarifier processing to amount to mark.
The project covers an area of 29500 ㎡, north and south to decorate. The original water from the waste water is entered into the treatment plant by the west side. After treatment, the north water pump room is sent to the plant to supplement the water.
2 elevation design
The ground elevation is the relative elevation of the treatment system. The waste water is only improved by the pretreatment of the pretreatment, and then the treatment works by gravity flow.
3 construction and structure design
According to the geotechnical engineering investigation report, important structures such as high density clarifying pool, v-shaped filter and pretreatment unit fall on the pebble layer, and the foundation soil is subjected to a standard value of 400kPa. General buildings such as complex buildings are on the clay soil layer, the foundation soil bearing stress standard is 150kPa.
Adopts the public tender for the construction of the wastewater treatment projects, by our company won the bid, the main technology system of high-density clarifier, v-shaped filter, automatic dosing and the control system adopts the technology and equipment of the company. As the core unit of high-density clarifier was developed by our company a way of inclined pipe and setting and sludge circulation clarifier, treatment process covers an area of less, with high efficiency, convenient management, etc.
With advanced technology and high automation, this project has been well run since its production. The water quality is stable, the effluent suspension is less than 5mg/L, COD is less than 15mg/L, and the water content is 30%.
Jining day general equipment co., LTD. Is a company engaged in water treatment equipment production, sales integration enterprise, after continuous efforts won the demand of the market both at home and abroad, won the customer consistent high praise. Over the years, the company has always adhered to the concept of innovation, quality, service, dedication and gratitude. Adopt new ideas, strict quality, all-round service tracking, insist on making high-quality products. My company main products: water treatment equipment, sewage treatment equipment, wastewater treatment, industrial wastewater, agricultural wastewater, rain water purification equipment, hospital sewage equipment, steel plant waste water equipment, slaughterhouse wastewater treatment equipment, food factory waste water treatment equipment and other equipment, can professional custom according to the water treatment equipment.
在古时候,当时的人类没有的水处理技术,为了降低疾病的水传播,他们便是采用简单的格栅截留和自然沉降等方法进行水处理。随后,经过多年观察和总结,他们也是发现了用砂子可以过滤掉细微悬浮物的方法,进而出现了药剂混凝预处理。随着人类文明的不断进步,人类产生的垃圾以及对环境的大肆破坏,导致了水资源受到严重污染。当各种传染病通过水传播,致使不少人染病或者死亡的时候,人们才是发现水处理是何等的重要。也正是如此,人们才逐渐开始研究水处理技术。
从十九世纪末开始,工业技术得到长足发展,工业污水也是逐年翻倍产生。而且当时的工业强国的河流、湖泊也是遭到严重污染,逐渐成为社会公害。人们发现,简单的化学、物理方法以及难以处理这些污水,研究出新型的水处理技术已经急不可耐了。各国的科学家都开始着手研究水处理方法,早是污水曝气试验,然后又是生物膜法,接着再是人工生物处理法,再到如今具有针对性的离子交换法、电化学法等高新技术。
钢铁厂废水处理工程概况
该钢厂形成600万吨/年生产规模时,平均排水量将达到4000m³/h。废水处理工程设计平均日处理能力9.6万米3,夏季大日处理能力10.8万米3,其中70%作为工业补水回到厂区管网,其余达标后排放。
该废水处理回用工程于2010年4月开工建设,20012年1月主体结构完工,2012年5月试运行,2012年8月交付生产。工程占地29500㎡,新建建、构筑物占地8041㎡,绿化覆盖率32%,静态投资为8643万元。
厂区全部废水经处理后达到排放标准,其中回用水经软化、过滤、消毒等深度处理后,达到生产用水标准。
处理工艺
废水设计水质
本工程原水属典型的冶金工业废水,处理后外排出水要求达到地方排放标准中的二级标准。

处理工艺
本工程进水为典型的钢铁工业废水,有机污染物含量不高,可生化性差,不适宜采用生化方法降解。本项目主要采用物理化学法。作为工业补水,在回用水深度处理中增加去除暂时硬度、总碱度软化、过滤、消毒等工艺。


厂区排出的工业废水用管道输送至废水处理厂进水口。经过预处理部分,用粗、细格栅将来水中较大颗粒的漂浮物去除;再由提升泵到配水构筑物,在此投加混凝剂和石灰以及硫酸,然后将废水分配到高密度澄清池,除去水中的悬浮物和胶体物质,水的澄清度,同时外排水还有除氟工艺。总进水的70%经高密度澄清池处理后,再经V形滤池过滤并投加液氯消毒后,送往厂区作为工业水的补充水,总进水的30%经高密度澄清池处理至达标后排放。

本工程占地面积29500㎡,南北向布置。废水原水由西侧进入处理厂,经处理后由北侧回水泵房送入厂区作为补水。
2 高程设计
地面标高作为处理系统的相对标高±0.00.废水只经过预处理提升泵一次提升,此后处理工程靠重力流实现。
3 建、构筑物设计
根据本工程岩土工程勘察报告,重要的构筑物如高密度澄清池、V形滤池、预处理单元等基础落在卵石层上,地基土承受标准值400kPa;一般建筑物如综合楼基础落在黏质粉土层上,地基土承受力标准值150kPa。

该废水处理工程的建设采用公开招标,由我公司中标,其主要工艺系统高密度澄清池、V形滤池、全自动加药及控制系统均采用该公司的技术和设备。作为核心单元的高密度澄清池是由我公司研制的一种斜管沉淀及污泥循环方式的高速澄清池,具有处理工艺占地少、处理、管理方便等特点。
本工程凭借的工艺、高自动化控制,投产以来运行良好。采用本工艺处理冶金行业废水经济有效,出水水质稳定,出水悬浮物小于5mg/L,COD小于15mg/L,污水含水率30%。
济宁天通设备有限公司是一家从事水处理设备生产、销售集一体化的企业,经过不断的努力在国内外获得了供不应求的大好市场,赢得了客户的一致好评。多年的发展历程,公司始终坚持创新、品质、服务、敬业、感恩的理念。采纳新创意,严格质量,的服务跟踪,坚持做出产品。我公司主要产品:水处理设备,污水处理设备、废水处理设备、工业污水设备、农业废水设备、雨水净水设备、医院污水设备、钢厂废水设备、屠宰场废水设备、食品厂废水处理设备等多种设备,可根据要求定制水处理设备。
联系我时,请说是在黄页88网济宁污水处理成套设备栏目上看到的,谢谢!

优质济宁污水处理成套设备信息推荐

留言板

  • 污水设备钢铁厂废水设备钢厂废水设备水处理钢铁厂废水工业废水
  • 价格商品详情商品参数其它
  • 提交留言即代表同意更多商家联系我

济宁市天通机械设备有限公司

地址:山东省济宁市任城区唐口街道

最新污水处理成套设备信息

“水处理钢铁厂废水工业废水处理设备就选济宁天通”信息由发布人自行提供,其真实性、合法性由发布人负责。交易汇款需谨慎,请注意调查核实。